Help and Support
Ask a question, report a problem, request a feature...
<<  Back To Forum

Queueing Feature Request

by timerrington@hotmail.com on 2017/10/07 10:12:17 PM    
I would like to be able to tell Tixati to (skip-queue)-start the next queued download, shortly before the existing download(s) finish - with an adjustable Trigger such as 2 minutes eta, or 5% left to DL or 250K left to DL.

Currently, when downloading 1 (or 2) torrents, the DL finishes and then the next queued DL starts. But it takes time to connect to peers, begin the bandwidth cycle and generally get going.

This suggested feature would allow users to let the next queued item start preparing itself, while the previous DL is finalising, and should result in reducing the lost bandwidth during changeover, when downloading 1 or 2 items at a time in a long queue of items.

Cheers




This web site is powered by Super Simple Server